Martabe Gold Mine – Mining Hose Package to Solve Enviro Challenges
The Martabe mine in North Sumatra, Indonesia is one of the largest gold mines in the world with a throughput of 4.5 million tonnes of ore per year. Martabe is owned and operated by PT Agincourt Resources which is planning future capacity upgrades of up to 6.5 million tonnes per year.
We worked with design engineer Ausenco to deliver a complete Australian-made Slurryflex slurry hose package for the new plant to meet the site’s unique environmental challenges that included frequent seismic activity and heavy rainfall. In seismically active, high-rainfall sites like Martabe, a flexible mining hose absorbs ground movement and pipe misalignment that would crack rigid HDPE or steel spools over time.
Client
Agincourt logo
Design engineer Ausenco
Year 2012
Project size $0.1M
Location Indonesia
Related projects
Large DN1050 Ceramic Hose Bends for the KCGM Growth Project
Supplying two custom Slurryflex CLX XC-Series bends for the mill pump discharge / cyclone feedline in Kalgoorlie.
How Roy Hill Solved Costly Unplanned Piping Maintenance for Good